The single power generation unit of Ceylon Electricity Board (CEB) GT-7 at the Kelanitissa power plant premises was shut down abruptly this morning due to absence of diesel, the CEB spokesperson said.
He said the operations of GT-7 plant came to an abrupt halt at 7:21 am.
With the shutdown of the power plant, 115 MW of electricity supply was denied to the national grid.
SriLankan Airlines’ newly added Airbus A330-200 landed at the Bandaranaike International Airport a short while…
The government has planned to deploy 100 comfortable, low-floor buses for passenger transport along several…
Elon Musk-owned electric vehicle (EV) giant Tesla is “not interested in manufacturing in India”, the…
Deputy Prime Minister and Minister for Defence of Australia Richard Marles, reflecting on the 70-year…
The newly acquired Airbus A330-200 aircraft by SriLankan Airlines is scheduled to arrive in Sri…
A medical laboratory in Malwana (Biyagama Hospital- Malwana) was fined Rs. 500,000 by the Mahara…