Categories: Headlines

Government to check cost overruns in mega projects

The Government has decided to set up a special Cost Estimate Review Committee, in a bid to avoid cost overruns and discrepancies in Total Cost Estimates (TCE) and actual cost in infrastructure projects.

The Committee is expected to review TCE and contract cost variation variances of infrastructure development projects falling under Cabinet Appointed Procurement Committees (CAPCs) value threshold. The Committee is expected to curtail a recent trend observed, where cost overruns have been accommodated in projects, often without any upper ceilings.Â

Proposing to set up the Committee, Finance and Mass Media Minister Mangala Samaraweera informed Cabinet that a large number of contracts have been awarded over and above the engineers’ cost estimates, and instances of upward revision of cost occurred during the implementation state have become a frequent occurrence.  A number of reasons, including lack of due consideration given to the initial project preparatory works, incomplete and inaccurate project design drawings and plans, resulting in unrealistic cost estimation, errors and omissions in the engineers’ cost estimates, faulty tender documents and discrepancies among documents, and lack of proper prefeasibility studies lead to cost over runs, the Minister explained. The Review Committee would consist of respective officers under the Ministry of National Policies and Economic Affairs, and they would review projects under the authority of the CAPCs.

The Cabinet of Ministers approved the Finance Minister’s proposal to appoint Former Ministry of Transport and Civil Aviation Secretary Nihal Somaweera as the Committee Chairman, and five other members to sit in the Committee.

The Committee will be tasked with carrying out the prior review of cost estimates, limiting margin for variations to 10% between the substantially responsive lowest evaluated bid price and the engineer’s estimate. Setting up the Committee will also limit the authority for handing contract cost variations by Heads of departments and Project Directors, who are currently responsible for the matter.


UAE firm gets $ 3.67 b Lankan ilmenite deal

The Government has decided to award ilmenite tender to Rescom Mineral Trading FZE, based in the United Arab Emirates.

Earlier, State-owned Lanka Mineral Sands Ltd. called tenders to sell 25,000 metric tons of ilmenite, where the technical committee evaluated the rate offered by Rescom Mineral Trading FZE at $ 145.25 a ton to be the best price.

Accordingly, the proposal made by Industry and Commerce Minister Rishad Bathiudeen was approved by the Cabinet of Ministers, Cabinet Co-Spokesman Gayantha Karunathilaka said yesterday. The total value of the tender is set at $ 3.676 billion including royalty fees, he added.

Rescom is one of the largest mineral and metal conglomerates in the Middle East and Asia Pacific regions. It says its competency in the minerals business is in prospecting, mining, sourcing, processing, trading and delivering minerals and metals to the world›s leading oil-drilling, ceramic, glass, construction, energy and fertiliser industries. Headquartered in Dubai, UAE, the group has an industrial presence in India, Hong Kong, Kuwait, Indonesia, Malaysia and Thailand.

Lankanewspapers

Recent Posts

LNP – Ranil arrested over personal tour to UK using public funds: Bimal

Former President Ranil Wickremesinghe was arrested for going on a personal tour to the UK…

22 hours ago

LNP – Ex-President Ranil brought to court after arrest

Former President Ranil Wickremesinghe, who was arrested by the Criminal Investigation Department (CID), has been…

22 hours ago

LNP – Ranil’s arrest – First of its kind in SL history

Former President Ranil Wickremesinghe, who was arrested by the CID a short while ago, is…

24 hours ago

LNP – Former President Ranil Wickremesinghe arrested

Former President Ranil Wickremesinghe has been arrested by the Criminal Investigation Department (CID). He was…

1 day ago

LNP – Former President Ranil Wickremesinghe arrested

Former President Ranil Wickremesinghe has been arrested by the Criminal Investigation Department (CID).

1 day ago

LNP – Parliamentary Business Committee to discuss no-confidence motion today

A meeting of the Committee on Parliamentary Business is scheduled to be held in Parliament…

2 days ago